دقة عالية في تكوين المسام، جهاز الحفر الدوراني SUNWARD SWDM300
دقة عالية في تكوين المسام، جهاز الحفر الدوراني SUNWARD SWDM300

دقة عالية في تكوين المسام، جهاز الحفر الدوراني SUNWARD SWDM300

وصف

أقصى عزم دوران ناتج 298 كيلو نيوتن متر
الوزن الإجمالي للجهاز 103 طن
أقصى قطر للركيزة 2500 مم
أقصى عمق للركائز 88 متراً
طراز المحرك Cummins QSM11-C400
القدرة المقدرة 298 كيلوواط
نطاق السرعة 6-28 دورة/دقيقة
أقصى قوة ضغط 260 كيلو نيوتن
قوة الرفع 280 كيلو نيوتن
سرعة 80 م/دقيقة

يشارك :

وصف تفصيلي

وصف

High torque and strong penetration into rocks, compatible with complex geological formations

The rated output torque is 300kN · m (the upgraded 300H model can reach 320kN · m), with a maximum pressure of 260kN, matched with a Cummins 298kW high-power engine. The drilling efficiency of moderately weathered limestone, granite, and hard interlayers is more than 20% higher than that of similar models, making it the main model for large-diameter deep piles and rock socketed piles.
The maximum borehole diameter is 2.5m and the deepest borehole is 90m, suitable for high-rise buildings, large bridges, wind power foundations, and heavy pile foundation projects in ports.

Patent enhanced power head with longer lifespan and lower failure rate

Equipped with invention patents to strengthen the driving key bar, eliminating the problem of bolt breakage in traditional model key bars, and extending the service life of supporting drill rods by 10%; Built in multi-point forced circulation lubrication+multi-layer sediment seal, high-strength continuous heat dissipation into the rock, the gearbox is not easily damaged by mud, greatly reducing the frequency of construction site shutdown and maintenance.

High flow hydraulic system, fast pile forming speed

Load sensing+total power adaptive hydraulic matching, main winch lifting speed up to 80m/min, single-layer large-diameter drum winding, steel wire rope life increased by 60%; The actions of lifting soil, drilling, and throwing soil are coherent, and the daily pile formation rate under the same rock embedding conditions is higher than that of competitors. It has been measured that an additional 1-2 pile foundations can be completed per day under the same rock embedding conditions.

 

 

 

———————————    للاطلاع على المزيد من التفاصيل، يرجى النقر على المستند أدناه.     ———————————

 

كتيب شركة سوتشو يينغشين لهندسة الآلات المحدودة

 

——————————————————     بعد النقر، يمكنك العرض أو التنزيل!     ——————————————————

قد يهمك ما يلي