Stable chassis and strong rock penetration ability
Widening and weighting special track chassis, lower center of gravity, standard stacked modular counterweight, can be added or removed as needed, optional external counterweight; Soft soil, slopes, and rock entry construction are not prone to warping, the overall machine shaking is small, and the verticality of the borehole is high.
3715mm ultra small turning radius, suitable for small construction sites such as urban villages, basements, and factories, providing flexible transportation and transition.
High precision, durable and long-lasting power head
Three sets of wear-resistant long guiding structures, suppressing drill rod deviation, high compliance rate of pile foundation verticality, suitable for high standard pile foundations in building and bridge construction;
Built in dual buffering structure, providing cushioning and shock absorption during rock and gravel impact drilling, protecting the power head and drill rod, and reducing the cost of replacing vulnerable parts;
Multi speed torque matching, fast slag removal from soft soil, low-speed crushing of rock layers with high torque, and overall construction efficiency improvement.
Hydraulic energy-saving, low operating costs
Multi pump series parallel intelligent power distribution, load sensitive main valve supplying oil as needed, automatic power reduction under no-load/light load, saving 10% -15% fuel compared to competitors under the same operating conditions;
Integrated hydraulic pipeline layout, with fewer pipelines and leakage points, and simple daily maintenance; The main winch of the long drum has uniform wear on the steel wire rope and a longer replacement cycle.
Wide adaptability to working conditions, versatile for one machine
42-70m depth, maximum 2.5m aperture, covering high-rise residential buildings, municipal bridges, high-speed railway roadbeds, and small pile foundation support;
It can be equipped with casing, rolling machine, and impact hammer to deal with prone to collapse formations such as quicksand, silt, and backfill soil, while also taking into account rotary drilling and casing follow-up construction.
——————————— For more details, please click on the document below to view ———————————

—————————————————— After clicking, you can view or download! ——————————————————