| Rated power | 93kW |
| Maximum output torque | 60kN・m |
| Maximum drilling diameter | 1000mm |
| Maximum drilling depth | 21m |
| Apply pressure | 100kN |
| Lifting force | 120kN |
| Overall working quality of the machine | 21000kg |
Efficient & energy-saving SUNWARD Swdm60H Rotary Drill Rig
وصف
وصف تفصيلي
وصف
High reliability and compact design
The main and auxiliary winches are integrated into the tripod, ensuring a stable center of gravity and compact structure of the entire machine; The ground contact ratio of the track is small, making it highly passable in narrow areas, urban alleys, and rural roads. It is suitable for limited scenarios such as small buildings, municipal pipelines, and photovoltaic pile foundations.
Efficient energy saving and low cost
optimized power matching between engine and hydraulic system, resulting in lower fuel consumption compared to models of the same class; The single-layer drum rope arrangement technology significantly extends the service life of steel wire ropes; Commonly used shaft centralized lubrication, with fewer maintenance points and lower maintenance costs; The cost of purchasing machines and equipment is much lower than that of medium and large rotary excavators.
Intelligent and user-friendly
equipped with automatic vertical adjustment, 360 ° monitoring, and fault alarm; Suspended seats in the driver’s cabin with a large display screen, providing comfortable operation and low labor intensity; Support remote data transmission for device management and after-sales diagnosis.
Suitable for various soft soil conditions
high drilling efficiency in conventional formations such as clay, sandy soil, and silty soil; Optional casing operation to deal with quicksand layers; Especially suitable for new rural construction, small factory pile foundations, and shallow pile engineering in urban renovation.
Perfect after-sales and parts system: Shanhe Intelligent has established a dense service network in China, with a short supply cycle for parts, which can quickly respond to sudden failures on construction sites and reduce downtime.





